Article DetailsNingbo to Ease up Downtown Traffic Jam in Two Years |
| Date Added: December 23, 2009 01:25:18 AM |
| Author: |
| Category: Decorative Materials |
| To facilitate effective for solving the traffic situation downtown, improve transportation systems and urban traffic problems, Ningbo municipal double blanket government recently, the measures taken to alleviate congestion in the center of Ningbo, which decided that the city will construct 50, through ongoing projects, bridges and subways, and lead the implementation of the joint distribution of the traffic police department in the city for 29 intersection often stuck in Haishu. Under Gas control valve the measures, the task is difficult and long-term project engineering system that requires the participation of many services and therefore must mobilize the whole society and practical measures for all work on the project. The city needs to strengthen its leading position in the program to make a concerted effort, investment and construction. |